Flood damage road rehabilitation, Bangladesh

Client: Roads & Highways Department, Bangladesh

Severe floods in 2004 necessitated a fast-track project to rehabilitate 320km of rural secondary roads in Sylhet Zone. Works included culvert and bridge repairs, embankment strengthening and pavement rehabilitation.

Roughton carried out the following for the rehabilitation works:

  • Road condition surveys
  • Damage assessment
  • Detail designs
  • Cost estimates
  • Contract documentation

 