Client: Carillion Health
Following the construction of the new PFI Hospital extention at Queen Alexandra Hospital, a 14 month project to reconfigure and upgrade the original hospital buildings to meet current standards, was undertaken.
Works included:
- Installation of temporary stand alone cathodic facilities
- Assessment of the existing structure to receive new plant
- New access to the A&E Department
- Multi-disciplinary design for the reconfiguration of Levels D,F and G to include upgrade dirty utility, clean utility, assisted bathrooms, offices, consulting rooms etc
- Relocation of hospital sterilization and disinfection unit
- Multi-disciplinary design of link corridor to HSDU
- Assessment of the existing lift shaft structure to receive proposed lift test specification
- Reconfiguration of the Estate Transportation Plan
- Reconfiguration of the Estate Drainage Works
- Wind Study and reconfiguration of the entrance and main lobby