Road network improvement and maintenance project II, Bangladesh

Location: Bangladesh

Client: Government of Bangladesh

The project comprised four main parts with the overall objectives of; improving 243km of national, regional and type a feeder roads, periodic maintenance of 900km of priority road sections, introduction of performance based maintenance contracts for routine maintenance, and improvement of accident black spots and provision of axle-load controls.

Roughton carried out the following:

  • Construction supervision of road improvement and periodic maintenance contracts
  • Prioritisation design and contract documentation
  • Technical assistance for performance based routine maintenance contracts
  • Development of indicators and standards
  • Production of conract documents
  • Bid evaluation
  • Assistance and training to Roads and Highways Department staff supervising the first year contracts
  • Road safety roads audit
  • Examination of accident-prone sections
  • Accident analysis
  • Development of axle-load control systems