Project

email us: info@roughton.com

Access roads to Tumba College of Technology, Rwanda

Client: Rwanda Transport Development Agency

The gravel access road is located in the North Western part of Rwanda. The project involved upgrading and widening of 9.5km of the existing track to a 6 - 7 m wide paved road with 1 - 1.5m shoulder each side and drainage works.

Roughton was appointed to undertake the following:

  • Fulfil the role of Engineer Representative
  • Construction supervision throughout the entire construction period and the defects liability period
  • Ensure adhesion to contract specifications, quality standards, price and timeframe
  • Optimize the use of locally available material resources

 

Tumba college of technology
Junction at health centre

Footer