Project

email us: info@roughton.com

Improvement of Negromayo - Yauri - San Genaro Road, Peru

Client: Ministry of Transport and Communications

This project was the - final engineering study (detailed design) for the rehabilitation and improvement of road: Patahausi - Yauri - Sicuani, Section: Negromayo - Yauri - San Genaro, 86km secondary road in mountainous terrain in Southern Peru - Cuczo.

Roughton provided the detailed design for the 86km of road, including the following services:

  • Topographical study
  • Traffic study
  • Alignment and road design
  • Signage and road safety
  • Soils and materials
  • Pavement design
  • Hydrological study and drainage
  • Geological and geotechnical engineering
  • Structures and works of art
  • Archaeological study
  • Social and environmental impact assessment
    local children
    mountainous route

    Footer