Client: Governors of Poole High School The existing kitchen and dining facility at Poole High School was inadequate for the increased numbers of pupils. It consisted of three single storey blocks centrally linked and formed a double H on plan. ...
Client: Bournemouth Borough Council The project was part of the Building Schools for the future scheme to provide additional capacity in the school. The project provides a new twin storey building providing 15 new classrooms, with overhangs as ...
Client: UK Border Agency As part of the refurbishment works carried out at Immigration Removal Centre (IRC) Haslar the ceiling and roof was upgraded to meet the required security and operating environment. Roughton carried out the ...
Client: Dorset County Council To cater for the increase in pupils, the existing Holy Trinity infant and junior schools needed to be upgraded and extended, but the 1950s school was not suitable for this. The new, larger primary school was for 608 ...
Client: Dorset County Council Downlands Primary School is situated within the MOD’s Blandford Camp, and accommodates children aged 4 to 11. The project was to provide better facilities for 210 school children through the provision of a ...
Client: Dorset County Council The existing primary school on Portland was old and not suitable for extension. As part of a new Portland Academy for primary and secondary schooling, part of the old Royal Navy Osprey base was used to build the new ...
Client: Imperial College NHS Trust Hammersmith Hospital is one of the largest in London. This project was to allow for the installation of a new dedicated imaging suite for the hospital including 2 new MRI Scanners and a SPECT/CT. At ...
Client: Imperial College NHS Trust Hammersmith Hospital is one of the largest in London. This project was to allow for the relocation and expansion of the Cardiac Catheter Suite from St Mary’s Hospital. At this busy and live ...
Client: London Underground Ltd It was perceived by London Underground Ltd (LUL) that the design of new track drainage using the then LUL Engineering Standards generated flow rates that are in the order of 30-40% higher than those actually ...
Client: Tubelines Ltd Prior to commencement of the Station Modernisation programme (carried out as part of the PPP Contract), Tubelines undertook inspection and assessment of all assets for which no current inspection and assessment existed, to ...
Client: Dyer and Butler for London Underground Ltd As part of London Underground’s Sub?Surface Railway Upgrade Programme (SUP) new 7-car S-Stock trains will be introduced onto the Circle and District Lines of the Sub-Surface Railway (SSR) ...
Client: Transport for London Following redevelopment of the transport interchange serving Loughton in Essex, Roughton was requested by Transport for London to undertake a review of the works and to develop solutions for the frequent instances of ...
Client: Tubelines Ltd As part of the PPP Contract, Tubelines was required to undertake inspection and assessment of all assets for which no current inspection/assessment had been undertaken: 'Grey' Assets. The programme of works comprised a three ...
Client: London Underground Ltd Roughton was initially commissioned by London Underground Ltd (LUL) to undertake an investigation to identify the quality of discharge from the existing septic tank/filter bed arrangement serving the platform level ...
Client: Dorset County Council Puddletown is a new primary school on a greenfield site in Dorset on the edge of Puddletown village. The project, which formed part of the Roughton Framework commission with Dorset County Council, involved the ...
Client: Brewer Smith & Brewer The new Meeting House is a single storey building approximately 29m long and 27m wide which will provide facilities for a chapel to seat a congregation size of 130 people, teaching rooms, offices, kitchen, ...
Client: London Underground Ltd Chancery Lane Station is located at the junction of High Holborn, Hatton Garden and Gray's Inn Road and serves the Central Line. The station has historically suffered from significant water ingress issues and their ...
Client: London Underground Ltd Roughton is retained consultants to London Underground to advise on numerous projects from building surveying, structural engineering, civil engineering and public health to mechanical and electrical ...
Client: Hampshire County Council The school had grown and existing two storey teaching block 'A' needed extending by two bays (45 additional classrooms). The library block 'M' had to be doubled in size due to numbers and the sports hall needed ...
Client: Dorset County Council The existing Mountjoy School in Bridport provided education for pupils with severe learning difficulties. The school was advised that it needed to improve its links with a school at secondary level, to satisfy the ...